Google 250kW green data center Videos and PDF for improving PUE from 2.4 to 1.5

If you are looking to improve the PUE of a small data center (250kW), Google has shared its best practices they have implemented at 5 locations.

The question I asked Google's Joe Kava was what he thought the PUE could go to with more load in the facility.  The current load is 85 kW in a 250kW capacity.  PUE is currently at 1.5 and more load in theory bring PUE to 1.35-1.4, but there will be step function when an additional CRAC unit needs to be brought on line.

There are 4 CRAC units in the room and now only 2 are run while the other 2 are back-up.  After a week of operation, the operation is flipped evening out the wear on equipment and insuring the back-up cooling is operational.

Here is a PDF that describes the whole project - Google's Green Data Centers: Network POP Case Study.

image

Here is before and after images of the airflow.  Joe said Google samples data once a second to monitor the power and cooling systems in the room.

image

image

A 10 minute video goes along with the white paper.

If you want to segment the 10 minute video into specific areas of interest here are 5 video segments you can view.

Data Center Efficiency Best Practices Part 1 - Intro and Measuring PUE

Data Center Efficiency Best Practices Part 2 - Manage Airflow

Data Center Efficiency Best Practices Part 3 - Raise the Thermostat

Data Center Efficiency Best Practices Part 4 - Utilize Free Cooling

Data Center Efficiency Best Practices Part 5 - Optimize Power Distribution